RECENT PROJECTS: - Three Valleys Water – New Borehole Installation A Borehole installation from well drilling through to final commissioning into supply. - Bucks - Thames Water Utilities – Rapid Gravity Filter Refurbishment 3 separate four month contracts refurbishing the RGF beds at Kempton Park and Ashford Common water treatment works. – Middlesex - Folkestone & Dover Water Services – Pumping Stations 3 separate pumping station decommissions and new replacement stations installed from design through to commissioning and network introduction – South East - Sutton & East Surrey Water – 16 Borehole / Booster Station upgrades Upgrade and control modifications to various multi-positional valves, pipe work and control panels for existing booster stations and borehole installations – Sutton & Surrey - Black & Veatch – Reservoir Balancing Chamber Refurbishment Shot Blast and protective coat the internal walls of a 13’ diameter chamber to a depth of 60 feet. Survey structural condition for mechanical integrity and replace bolting / flanges where necessary – Thames Water Works – Hampton - Doncasters Bleanavon – Filtration Plant Industrial Forge A filtration plant was designed and installed to extract and clean licensed water from a nearby pond to supply suitably treated water for the forge processing plant – Wales - Scottish Brewery – Sodium Hypochlorite Dosing Plant Process water was required to be extracted from an existing on site borehole to provide additional plant supplies. Watercare designed, built and installed an automated dosing plant and control system to enable the treatment and storage of this new source - Reading