CHLORINATION & STERILISATION SERVICES Watercare Utilities Ltd include in all our installation procedures a stringent sterilisation program to ensure all equipment is fit for connection to network or other processes. From the basic blank, install and wipe ethos of installations to the designing in of forced chlorination tappings, Watercare guarantee a clean installation of equipment. All our installations are chlorinated between 20 & 50ppm (dependant on clients preference) and monitored throughout its wash / cleaning cycle. Samples are then taken for bacterial tests before signing off as fit for purpose. In addition to our installations, Watercare Utiltiies have chlorination teams that can post chlorinate other installations or old sections of pipe work / plant required to be put back in service. Our experience has enabled us to overcome the most tricky dead legs and inaccessible areas providing full chlorination (not just residual hope).